Visited the site this morning to meet with the builder and the fireplace installer. They’re both pleased to be putting in a wood burning stove instead of the big, ostentatious propane thing. The plumber’s been out and installed one of the bathtubs; we reckon he’ll be back to do the other one soon. Meanwhile, the builder’s just pleased to have the exterior all wrapped in Tyvek so the inside will stay dry. He plans to have all the doors on next week, only waiting to finish moving big stuff in and out before restricting the entrances.
As I arrived this morning, they were just dropping setting the septic tank into the ground next to the building.
Really, it’s all coming together!